What should I look for in a punch list walkthrough?

  1. Appliances are fully functioning.
  2. Cabinet drawers and doors open and close without problems.
  3. No hardware is missing and works smoothly.
  4. Windows and doors open and lock without problems.
  5. Lights and outlets are fully functioning.
  6. Paint and texture problems.

How do you build a construction punch list?

  1. Free the Specifications. If drawings show how things go together, specifications tell what things to use.
  2. Get Transparent with Quality.
  3. Activate Technology to Improve Your Punch List Processes.
  4. Getting to a Near-Zero-Item Punch List.
  5. Improve Your Punch List Process.

What are typical punch list items?

In construction projects, some common punch list items that will make it onto the snag list can include appliances not working, cabinets, doors and drawers not opening properly, damaged floors, and so on. Construction punch lists are helpful documentation for your project.

What is a renovation punch list?

A punch list is a document that lists final work items remaining before a construction project is considered complete. Contractors add to the punch list all work that does not conform to the specifications in the construction contract.

Who prepares the punch list?

According to the General Conditions (AIA A201 Section 9.8. 2), the Contractor prepares and submits to the architect a comprehensive list of items to be completed or corrected. This snag list, as generated by the Contractor, is known as the punch list.

What is the difference between snag list and punch list?

The snag list, also known as a punch list in the US, is a document showing work that still needs to be done on a construction project. Another fun fact and mini history lesson is that the term punch list comes from the antiquated process of actually punching holes in a list to mark which items needed fixing.

How much do you have to hold back for a punch list?

So, you essentially retain part of your retainage to make your punch list payment later once everything is truly 100% complete. The typical amount you should withhold for punch list items should equal about twice the amount it costs to fix the punch list items.

What is final punch out in construction?

A punch out person, or punch out technician, will start after all the other workers have concluded their jobs. This means the carpenters, electricians, and painters will all have gone home already. A punch list is created by the customer or the customer’s representative.

What is construction closeout?

Project closeout is the successful completion of a project and the final transfer of assets to the client. It includes heavy oversight to ensure the project is ready, like checking specifications, collecting documents and closing out existing contracts for equipment rentals or subcontractors.

Is punch list before or after substantial completion?

A punch list provides the contractor, architect and owner an opportunity to identify remaining work at substantial completion. It is usually provided for by contract. It is the final step in the collaborative process of assuring that the project is delivered in accordance with the design intent.

Why is a Punchlist important in closing a project?

Punchlist. Once the physical construction of a project has been completed, the construction project manager and architect will do a walkthrough of the project and note any changes that need to be made. This is known as the punchlist and is an important component of the post-construction phase of a construction project.

What does substantially complete mean?

Substantial Completion Definition Substantial completion means the project, or a portion of the project, is fit for its intended use. The owner can then occupy and use the property. The owner must also pay the contractor the last portion of the monies owed for that project or portion of the project.

What is frame punch in construction?

A framing punch checklist is a document that lists the tasks, requirements, tools and equipment used when framing a house. Business Forms.

What does a punch walk mean?

What is a punch walk? A punch walk is an essential step in delivering a successful project. It’s the review process where the contractor, subcontractors, owner, and architect/designer walk through the project together to catch all the remaining issues and flaws in the execution of the project.

What is a punch item?

In regards to construction today, the Business Dictionary defines a punch list as, “Listing of items requiring immediate attention” and as a “Document listing work that does not conform to contract specifications, usually attached to the certificate of substantial completion.

What does back charge mean in construction?

In some instances, money flows in the opposite direction from you back to the contractor you are working for. This is known as a construction back charge (sometimes spelled “backcharge”) and occurs when you owe money back to the contractor you are working for.

What is a construction punch list?

A punch list (also called a snag list, deficiency list, or punch out list), according to the online Business Dictionary, is “a document listing work that does not conform to contract specifications, usually attached to a certificate of substantial completion.” Put simply, it is a list of to-do’s that need to be …

How long does a snag list take?

It is possible to get a snag list in 48 hours or less after you contact your chosen snagging company. The inspection itself only takes several hours depending on the size of your house. It usually takes around 2 to 3 hours to inspect a two-bedroom apartment.

What do you look for in snagging list?

  • Is the plasterwork smooth and even? Is it neatly finished around pipework and sockets?
  • Are there any obvious flaws such as bumps or unfinished screw pops?
  • Do all walls look true? Are they straight and square?
  • Is there surface cracking larger than the thickness of a 10 pence piece?

How much should you hold back from a contractor?

Simply, a holdback is a requirement that owners, contractors and/or subcontractors withhold 10% of the costs of materials and/or services as supplied under a contract or subcontract.

What is a jab punch?

A jab is a type of punch used in martial arts. Several variations of the jab exist, but every jab shares these characteristics: while in a fighting stance, the lead fist is thrown straight ahead and the arm is fully extended from the side of the torso. This process also involves a quick turn of the torso.

What is a drywall punch?

When I say “punch” a house, I’m not talking about putting holes in your drywall. I’m referring to the writing of the “punch list,” which is created at the very end of a project and details any outstanding items that need to be taken care of.

What is a project closure checklist?

A project closure checklist (or project closeout checklist) is used by project managers to evaluate the business outcomes when formally closing a project. It helps assess project activities such as actual performance versus baseline objectives, unaddressed issues, and lessons learned within a project life cycle.

What are the project closeout process in 7 steps?

  1. Formally transfer all deliverables. The first step to closing out your project is to finalize and transfer the project deliverables to the client.
  2. Confirm project completion.
  3. Review all contracts and documentation.
  4. Release resources.
  5. Conduct a post-mortem.
  6. Archive documentation.
  7. Celebrate.

What should be included in close out documents?

  • Certificate of Substantial Completion.
  • Completed Punchlist.
  • Design Team Approvals.
  • Inspection Certificates.
  • Certificate of Occupancy.
  • Lien Waivers.
  • Final Pay Applications.