How do you redo a bathroom?

How do I make a renovation checklist?

  1. Consult a pro.
  2. Stabilize the structure, if necessary.
  3. Plan site access.
  4. Do any demolition work.
  5. Relocate any drains or plumbing.
  6. Major renovations.
  7. Flooring and minor renovations.
  8. Final punch list.

What order should remodeling tasks be done?

  • Step 1: Planning. Nail down a budget.
  • Step 2: Demolition.
  • Step 3: HVAC, Electrical, and Plumbing.
  • Step 4: Framing and Drywall.
  • Step 5: Painting.
  • Step 6: Cabinets & Fixtures.
  • Step 7: Doors & Windows.
  • Step 8: Clean House & Air Vents.

How long does it take to gut renovate an apartment?

“When properly planned by a skilled renovation team, the actual gut renovation itself—which entails taking everything out of your apartment, down to the studs—can take anywhere between three to 12 months. But it can take just as long to get the project off the ground.”

What are the steps in remodeling?

Whether it’s a full home addition or remodeling a room in your home, there are five distinct stages you can expect to go through: planning, budgeting, demolition, construction and cleanup.

What is the first thing to do when renovating?

  1. Strip out and removal.
  2. Structural work – floors, ceilings, walls.
  3. First fix work – plumbing, heating wiring.
  4. Plastering, flooring.
  5. Second fix work – plumbing, heating, wiring.
  6. Bathroom, kitchen fit-out.
  7. Decoration.

What is the first step to remodeling a home?

  1. get a personalized insurance quote today. A great rate is just a few clicks away.
  2. Make a plan.
  3. Set a budget.
  4. Hire a contractor.
  5. Talk to your insurance company.
  6. Secure permits and order materials.
  7. Start demolition.
  8. Work behind the walls.

Should you do floors or walls first?

Most people think that painting should be done first to prevent any spills from marring brand-new flooring. However, experts agree that new flooring should always be installed before you have any interior painting done.

What goes in first kitchen cabinets or flooring?

In most cases, given standard flooring heights, you will install the cabinets before the floor covering. Floor covering, or finish flooring, is the surface that you see and walk on, not the subfloor (under the underlayment) or underlayment (between the subfloor and finished layer).

Which room should you renovate first?

If you need to choose which room to remodel first, you’ll want to choose the room that will recoup the remodeling costs and create actual equity. This is why experts agree that choosing to remodel your kitchen or bathroom first is traditionally the smartest move.

How do you renovate a small apartment?

  1. Clean Out Your Apartment.
  2. Avoiding Excessive Artificial Lighting.
  3. STOP the Obsession with Size.
  4. Install Shower Doors.
  5. Add Flair with Mirrors.
  6. Go for Laminated Kitchen Tiles.
  7. Make Front Door Impressive.
  8. Express Yourself with Paint.

How long does a full gut renovation take?

Basically, if it is necessary to gut the whole home, it will take longer to put it back together. These types of construction projects often take six months to a year or more to finish. Generally, this is what many house flippers and rehab owners look for when they decide to take on a project.

Can I renovate my apartment?

Rule #1: Check With Your Landlord Before you start any renovations, make sure your landlord approves of the project. If you make unauthorized changes to your space, he or she could charge you a fine. You can also look through your lease to find any renovations that are allowed and may not require approval.

What are the five main types of remodeling?

  • Kitchen Remodel.
  • Bathroom Remodel.
  • Addition/ADU/Casita/Structural Remodel.
  • Exterior Home Renovation.
  • Whole House Remodel.

What’s the difference between a renovation and a remodel?

Essentially, the difference between them is that a renovation refers to restoring something to a previous state, while a remodel refers to creating something new.

When remodeling When do you paint?

We recommend painting once all major structural and functional work is done, but before new flooring or carpet is installed. Essentially, floors come last so you can avoid the heavier wear and tear multiple contractors, tools and dust the full renovation brings.

Should you renovate inside or outside first?

1. Do all of the foundational and exterior work first. It’s natural to want to move on to the next phase of your project, but ensure the house is sound before you begin interior work. That means replacing windows and putting on a new roof if needed.

How do you plan a renovation project?

  1. Decide what you want. This could mean taking magazine cuttings or speaking to friends/neighbours who’ve undertaken similar projects.
  2. Get a couple of estimates.
  3. Budget, budget, budget.
  4. Get permission.
  5. Decide whether to project manage yourself.
  6. Find tradespeople.
  7. Quote me happy.

What are the steps to remodeling a bathroom?

  1. Remove Bathroom Fixtures.
  2. Install the New Shower or Tub.
  3. Lay the New Flooring.
  4. Hang Drywall and Start Painting.
  5. Install Cabinets and Vanity.
  6. Update Lighting.
  7. Hook Up the Plumbing.

Do you put cabinets in before flooring?

Installing flooring before your cabinets is the best choice for most hardwood floors. When professionals install floors then cabinets, it’s easier to get everything to standard heights. It’s also a safer installation process for your cabinets since you won’t risk any damage to them as professionals install the floors.

Should baseboards be installed before flooring?

Baseboards are often installed before flooring, although it depends on the type of flooring being used. It is necessary for carpeting to have the trim in place, allowing the edges to be tucked under and out of sight. However, for hardwood or laminate, it is easier to install the trim after.

What comes first flooring or drywall?

When you’re hanging drywall and installing new flooring, it’s usually best to hang the drywall first and then save the floor for last.

Does flooring go under toilet?

If you’re installing a new floor, pedestal sink, and toilet, you should install the laminate flooring first so it’s under the sink and toilet. Because laminate flooring floats above the sub-floor on top of underlayment, it will expand and contract slightly with the temperature and humidity of the room.

Do you put laminate flooring under refrigerator?

When installing wooden or laminate floating floors in a kitchen, place small planks under a refrigerator running from side to side and allow longer planks to be featured in the main portion of the kitchen.

Do you install flooring under dishwasher?

While refrigerators and stoves can be removed easily to install the flooring, the same cannot be said for kitchens with a dishwasher. However, it is possible to install laminate flooring under a dishwasher without completely disconnecting it.

Do NOT follow this link or you will be banned from the site!